Appendix D: Change History

Date Version Change Description
1 Mar 90 0.0 Rough draft of the key practice tables; distributed to the
 CMM User Working Group. Version for review at the March
 1990 CMM W
fa0
orkshop.
1 May 90 0.1 Rough draft of the key practice tables appendix to
 incorporate recommendations made at the March 1990 CMM
 Workshop against Version 0.0. Version for internal SEI peer
 review.
6 Jun 90 0.2 Draft, revision to the key practice tables to incorporate
 comments from the SEI peer review of Version 0.1. Version
 distributed to the CMM User Working Group for its review and
 comments. (Baselined version of the key practice tables).
26 Feb 91 0.3 Draft, revision to the key practice tables (Level 2 key
 process areas only) to incorporate comments from the CMM
 User Working Group and the Questionnaire Advisory Board made
 against Version 0.2. Version for internal SEI peer review.
 Rough draft (first version) of overview and definitions to
 assist in the SEI peer review of the key practice tables,
 Level 2 key process areas.
18 Mar 91 0.4 Draft, revision to the key practice tables, Level 2 key
 process areas to incorporate comments from the SEI peer
 review of Version 0.3. Version distributed to the CMM User
 Working Group and Questionnaire Advisory Board for their
 review and comments. Rough draft, revision of overview and
 definitions to assist the CMM User Working Group and the
 Questionnaire Advisory Board in their review of the key
 practice tables, Level 2 key process areas.
10 Apr 91 0.41 Draft, revision to the key practice tables (Level 3 key
 process areas only, except Software Product Engineering key
 process area is not included) to incorporate comments from
 the CMM User Working Group and the Questionnaire Advisory
 Board made against Version 0.2. Version for internal SEI
 peer review.
22 Apr 91 0.5 Draft, revision to the key practice tables, Level 3 key
 process areas (except the Software Product Engineering key
 process area is not included) to incorporate comments from
 the SEI peer review of Version 0.41. Version distributed to
 the CMM User Working Group and Questionnaire Advisory Board
 for their review and comments. Rough draft, revision of
 overview and definitions to assist the CMM User Working
 Group and the Questionnaire Advisory Board in their review
 of the key practice tables, Level 3 key process areas.
17 May 91 0.51 Draft, revision to the Level 2 key practice areas to
 incorporate comments from the CMM User Working Group made
 against Version 0.4 and make practices of each key process
 area at a single maturity level. Version for internal SEI
 peer review.
23 May 91 0.52 Draft, revision to the key practice tables (initial version
 of Software Requirements Management key process area, and
 consolidation of Software Requirements Analysis, Software
 Design, and Software Testing key process areas and addition
 of coding practices into the single key process area,
 Software Product Engineering) to incorporate comments from
 the CMM User Working Group and the Questionnaire Advisory
 Board
190
. Version for internal SEI peer review.
5 Jun 91 0.53 Preliminary baseline, revision to the Level 2 key practice
 areas to incorporate comments from the internal SEI peer
 review of Version 0.51. Version submitted to SEI's
 Information Management.
7 Jun 91 0.54 Draft, revision to the key practice tables
fa0
 (initial version
 of Software Project Management key process area only).
 Version for internal SEI peer review.
14 Jun 91 0.6 Draft, revision to the key practice tables to incorporate
 comments from the SEI peer review of Software Requirements
 Management (Version 0.52), Software Project Management
 (Version 0.54), and Software Product Engineering (Version
 0.52) key process areas; incorporated Version 0.53 of other
 Level 2 key process areas. Version distributed to the CMM
 User Working Group and Questionnaire Advisory Board for
 their review and comments. Rough draft, revision of
 overview and definitions to assist the CMM User Working
 Group and the Questionnaire Advisory Board in their review
 of the key practice tables (Software Requirements
 Management, Software Project Management, and Software
 Product Engineering key process areas). Significant changes
 include (1) restructuring key process area practice tables
 by changing the common key features, (2) modifying the set
 of key process areas, and (3) rearranging the practice
 statements so that each key process area contains practices
 for a single maturity level.
21 Jun 91 0.61 Draft, revision to the key practice tables (Level 4 and 5
 key process areas only) to incorporate comments from the CMM
 User Working Group and the Questionnaire Advisory Board made
 against Version 0.2. Version for internal SEI peer review.
28 Jun 91 0.7 Draft, revision to the key practice tables appendix, (Level
 4 and 5 key process areas only) to incorporate comments from
 the SEI peer review of Version 0.61. Version distributed to
 the CMM User Working Group and Questionnaire Advisory Board
 for their review and comments.
10 Jul 91 0.71 Draft, revision to the Level 3 key process areas and
 Software Requirements Management key process area to
 incorporate comments from the CMM User Working Group made
 against Versions 0.5 and 0.6; make practices of each key
 process area at a single maturity level; and renamed three
 key process areas (Software Requirements Management to
 Requirements Management, Software Project Management to
 Integrated Software Management, and Technical Team
 Coordination to Intergroup Coordination). Version for
 internal SEI peer review.
14 Jul 91 0.72 Draft, revision to the Level 3 key process areas and
 Software Requirements Management key process area to
 incorporate comments from the internal SEI peer review
 against Version 0.71. Version for internal SEI peer review.
15 Jul 91 0.73 Draft, revision to the Level 3 key process areas and
 Software Requirements Management key process area to
 incorporate comments from the internal SEI peer review.
15 Jul 91 0.74 Preliminary baseline, revision to the Level 3 key process
 areas and Software Requirements Management key process area
 (reformatting and fixing editorial defects). Version
 submitted to SEI's Information Management.
22 
190
Jul 91 0.75 Draft, revision to the Level 4 and 5 key process areas to
 incorporate comments from the CMM User Working Group made
 against Version 0.7. Version for internal SEI peer review.
30 Jul 91 0.76 Preliminary baseline, revision to Level 4 and 5 key process
 areas to incorporate comments from internal 
fdb
SEI peer review.
 Version submitted to SEI's Information Management.
30 Jul 91 0.77 Draft, revision to the preliminary baseline of the
 Requirements Management key process area to incorporate
 comments from the 30 July 1991 Questionnaire Advisory Board
 meeting. Version for internal SEI peer review.
5 Aug 91 0.78 Draft, revision to Version 0.77 of the Requirements
 Management key process area to incorporate comments from the
 31 July 1991 Questionnaire Advisory Board meeting. Version
 for internal SEI peer review.
7 Aug 91 0.79 Revised preliminary baseline of the Requirements Management
 key process area to incorporate comments from the
 Questionnaire Advisory Board and the internal SEI peer
 review against Version 0.78.
7 Aug 91 0.80 Draft, revision of overview and definitions to incorporate
 comments received from the CMM User Working Group and the
 Questionnaire Advisory Board in their review of Versions
 0.4, 0.5, and 0.6 and restructure the document. Version for
 internal SEI peer review.
15 Aug 91 1.0 Baseline version for public release.
1 Sep 92 1.01 Draft, revision to Version 1.0 based on change requests
 received by 17 January 92 and recommendations from the CMM
 Workshop held 6-7 April 92. Training Program key process
 area replaced with Skills Building. Title of Technology
 Innovation changed to Technology Change Management.
8 Dec 92 1.02 Draft, revision to Version 1.01 to incorporate
 recommendations of CMM Advisory Board and comments from the
 internal SEI peer review. Training Program key process area
 restored, with minor upgrades to address skills- building
 concerns. Title of Process Measurement and Analysis key
 process area changed to Quantitative Process Management.
 Version for internal SEI peer review.
14 Dec 92 1.03 Draft, revision to Version 1.02 to incorporate comments from
 the internal SEI peer review. Title of Quality Management
 key process area changed to Software Quality Management.
 Version for internal SEI peer review.
18 Dec 92 1.04 Draft, revision to Version 1.03 to incorporate comments from
 the internal SEI peer review. Distributed to reviewers of
 version 1.01 and the CMM Advisory Board for comment and
 feedback.
15 Jan 93 1.05 Draft, revision to Version 1.04 to incorporate
 recommendations of CMM Advisory Board and comments from the
 internal SEI peer review. Version for internal SEI peer
 review.
10 Feb 93 1.1 Baseline version for public release.