Chapter 7. Specify the System Development Details
|
You should specify to the supplier (whether this
supplier be an internal Company-IR group or a third party) that they must
have:
·
a good methodology in order to
develop a system
·
a formal quality management
system for the development, supply and maintenance of the system
You should also make the supplier aware of the fact
that the Company may audit.
These are the standards that should be in place in
order to develop a system that can be validated. |
|
The supplier’s system must be developed using a good
methodology that uses a life cycle approach.
Note: A general description of a system life cycle
methodology can be found in the IR Policy Manual and other references (See,
References in the Reference Material part of this document). |
|
The supplier’s computer system must be developed using
a formal quality management system.
Adherence to a quality management system should provide
sufficient documentary evidence for subsequent acceptance by the validation
team. |
|
The quality management system should include procedures
associated with:
·
documentation control
·
project management
·
quality planning
·
life cycle definition
·
testing
·
configuration management
·
programming/technical
development standards |
|
A good methodology and quality plan will ensure that a
user requirements specification is developed.
This topic looks at the
user requirements specification. |
|
The user requirements specification:
·
describes the functions that a
system or system component must or should be capable of performing
·
is generally developed by the
user in the initial stages of a system development or system selection
process
·
is written in general terms and
specifies what needs to be done, not how it will be done
·
is independent of the specific
application program (technically non specific) that will be written or
purchased |
|
The following techniques
may be used to capture relevant user requirements:
·
workshops (such as critical
requirements analysis workshops)
·
interviews
·
presentations
·
data modeling
·
data flow diagrams |
|
The user requirements specification will be used as the
basis for the development of the system acceptance test scripts /
performance qualification test scripts (See, the topic
Performance Qualification in Chapter 8 - Perform Qualification
Activities).
The user requirements specification will be reviewed
during the specification qualification (See, the topic
Specification Qualification in Chapter 8 - Perform Qualification
Activities). |
|
A good methodology and quality plan will ensure that a
functional specification is developed.
This topic looks at the functional specification. |
|
The functional specification, or system
specification:
·
describes in a high-level
manner, the hardware, software and peripherals that make up the computer
system as a whole (Note: In system development terms, this specification
will form the basis of system testing.)
·
describes how the specific
system to be purchased or developed will meet the user and functional
requirements
·
describes the specific user
requirements that will not be met by the system
·
should include reference to
the data model to be used
·
should define the
functionality that does not relate directly to the user interface (e.g.
system interfaces)
·
should define the
non-functional requirements such as performance and availability.
|
|
The functional specification may be produced:
·
when a new application is
being developed
·
when the users need to be
exposed to the system before finalizing their requirements |
|
The functional specification may be produced from a
prototyping exercise in order to model the required user interface.
The use of prototypes should be carefully controlled
(e.g. by time boxing and controlling the number of iterations) and
maintained within the scope of the User Requirements Specification.
The agreed prototype forms part of the functional
specification and can be used as the basis for a first pass conference
room pilot. |
|
Functional specifications can comprise mechanical,
electrical, and software function specifications for systems embedded in
manufacturing equipment. |
|
The functional specification will be used as the
basis for the development of systems acceptance test scripts / operational
qualification test scripts.
The functional specification is reviewed as part of
Design Qualification (See, the topic Design Qualification
in Chapter 8 - Perform Qualification Activities). |
|
A good methodology and quality plan will ensure that a
design specification is developed.
This topic looks at the design specification. |
|
The design specification is a complete definition of
the equipment or system in sufficient detail to enable it to be built.
This specification will
form the basis of module/integration testing. |
|
The design specification is reviewed in the:
·
Design Qualification
·
Installation Qualification -
The design specification is used to check that the correct equipment or
system is supplied to the required standards and that it is installed
correctly.
(See, Chapter 8 - Perform Qualification
Activities). |
|
A good methodology and quality plan will ensure that
several types of documentation are developed.
This topic looks at the following types of
documentation:
·
end-user documentation
·
administration documentation
·
system support documentation |
|
End-user documentation comprehensively describes the
functional operation of the system.
This documentation should include:
·
some means of problem solving
for the user such as an index, trouble-shooting guide and description of
error messages
·
comprehensive drawings of the
system, if applicable
End-user documentation is generally produced by the
supplier or developer and should be updated each time the system changes. |
|
Administrator documentation is written for the
administrator (the user who will maintain and administer the system).
This documentation:
·
describes how to perform the
administrator functions, such as:
·
system configuration
·
adding users to the system
·
setting up levels of security
·
setting up and maintaining
master control records
·
may be a special section of the
end-user documentation or it may be provided as a separate document
Administration documentation is provided by the
supplier. |
|
System support documentation describes the system
administration activities that are specific to the software.
These administration activities include:
·
configuration of the
environment
·
installation
·
maintenance documentation
·
the running of batch jobs
System support documentation is provided by the
supplier or developer for the system administrator. |
|
A good methodology and quality plan will ensure that
several types of testing are undertaken throughout the development life
cycle.
This topic looks at the following types of testing:
·
module testing
·
integration testing
·
system acceptance testing
·
stress testing |
|
Module testing - sometimes known as unit testing - is
testing at the level of a single functional routine or software module.
At a simple level, and independent of the system as a
whole, unit testing verifies that the routine provides correct output for a
given set of inputs.
Module testing is carried out to verify that the system
performs as defined in a Design Specification (See, Chapter 8 -
Perform Qualification Activities). |
|
Integration testing:
·
verifies that the system
functions correctly as a whole
·
proves that all software
modules correctly interface with each other to form the software system as
defined in the design specification and functional specification
Integration testing is performed on the fully built
system, as it is to be used by the end-users. Data from other external
systems may, however, be provided by "dummy" interfaces.
Example: A manufacturing resource planning system might
be tested with data provided from a flat file that simulates the interface
to the inventory system, without requiring the inventory system to be
involved in the testing.
Similarly a process control system can be tested by
"dummying" inputs and outputs from field instructions in the plant. |
|
System acceptance testing is the testing of the
system’s interfaces to other systems in the computing environment.
It should cover both the testing of user requirements
and system functionality. This not only ascertains that the system accepts
data correctly from other systems, but also that it accurately passes data
to downstream systems and correctly processes data within the system itself.
System acceptance testing is usually done separately
from the integration testing in order to minimize the downtime and expertise
requirements for the other systems.
The testing may be performed:
·
at the suppliers (and then
repeated at the user site)
·
solely at the user site
|
|
Stress testing involves
cataloguing the fact that the system fails in expected ways that are not
catastrophic, yet are easily recognized as errors.
There are two categories of stress testing:
·
entering data that is outside
the range of acceptable data from the system and ensuring that the data is
flagged as an error
·
testing the system with a high
volume of transactions. The objective is to determine the maximum
operational capacity at which the system can be run without danger of loss
or corruption of data. Based on this type of testing, the system developer
will rate the system’s maximum operational capacity
These two types of stress testing should be performed
by the developer of the system as part of module testing and integration
testing rather than as a separate activity.
Similar testing of the system related to the user’s
planned operation and environment should be included as part of the
Performance Qualification (See, the topic Performance
Qualification in Chapter 8 - Perform Qualification Activities). |
|
For a standalone computer system, the system acceptance
testing broadly equates to OQ and part of PQ. Some aspects of performance
qualification may need to be performed by the user after system acceptance
testing (especially for configurable software packages).
For an embedded system, system acceptance testing is
only part of OQ/PQ since other machine performance checks of components
which do not form a direct part of the system will need to be performed. |
|
It is very important that direct traceability is
established between the specification and the test performed i.e. a cross
reference from the test script back to the section in the appropriate
specification where the function is defined.
This traceability ensures that all parts of the
software are tested, and clearly establishes the acceptance criteria for a
given test. |
Computer System
Retirement
|
The stages in the retirement process depend on the
definition of raw data for each system.
For regulatory systems, data must be archived either
electronically or as some form of hardcopy (paper or fiche). Continued
on-line access to data may be achieved by data migration to the replacement
system, although this should be treated as a development project in its own
right (design and testing of migration/translation tools, quality control of
a proportion of transferred data, etc.).
A pre-retirement review of validation is necessary to
ensure that the documentation and testing package is complete BEFORE the
system is dismantled. The physical decommissioning process should be
planned, ensuring overlap with the replacement system already operating
successfully in its production environment. |
|
|